A temporary event structure may only be visible to guests for a few days, but its success depends on decisions made much earlier. The clearest projects move through one connected process: understand the brief, design for the site, coordinate every service, build to the schedule and hand over with a flawless finish ready for guests arrival.
Consult around what the structure must do
The first conversation should cover more than guest numbers. TT Structures begins by understanding what must happen inside, what the event day demands, what the site allows and where the pressure points are likely to appear.
A hospitality suite, retail outlet, race-control space and temporary store can all use modular structures, but their requirements for access, sightlines, security, services and finish are very different. Defining those functions early prevents the footprint from becoming the only design decision.
Design the building and services together
The structure type and configuration are one part of the solution. Heating, air conditioning, power, lighting, flooring, decking, furniture, welfare, glazing, branded linings and bespoke fabrication can all affect the layout.
TT Structures arranges these elements through one point of contact. That means cassette flooring, terraces, climate control and fit-out can be coordinated with the frame and build schedule instead of being introduced as separate layers later.
Engineer for the actual site
TT Structures builds on Losberger De Boer systems engineered to BS EN 13782 and certified for UK wind and snow loadings. Site surveys, ground assessment and structural sign-off form part of planning the correct solution.
The site can materially change the design. At Boodles Tennis at Stoke Park, for example, six structures were delivered across undulating terrain that had to be scaffolded level and joined. Other projects connect to existing buildings, work on compact waterfronts or remain operational for weeks or months.
Build against the immovable date
Event opening dates rarely move. An effective programme therefore works backwards from when the structure must be dressed, tested and handed over, allowing for the build itself and for the teams completing power, climate, furniture, catering or branding.
TT Structures’ project and installation teams handle the build, with managing director Rupert Lewis involved on site. That personal accountability gives the client one clear route for decisions when several moving parts converge.
Deliver, operate and handover flawlessly
When the doors open, the temporary building must feel complete. After the event, the same planning discipline applies to the handover: teams, access and timings must be coordinated so the site is handed back cleanly.
What to include in an initial brief
- Event dates, location and the available build and strike windows
- Guest numbers, operational uses and required internal zones
- Site access, ground conditions, levels and existing buildings
- Preferred finish, glazing, branding, flooring and furniture
- Power, heating, cooling, lighting, welfare and production needs
Learn more about TT Structures’ process and engineering approach, explore the temporary structure range, or start a project brief.